How we work
Quality is part of the job, from the first drawing review to the last as-built. Multi Tech owns QA/QC on every project instead of handing it back to you at the end.
From drawings to closeout
Review the drawings and MOPs
Before work starts, the lead tech walks the crew through the engineered drawings and the method of procedure, so everyone builds to the same plan.
Install with a lead tech on site
An experienced lead tech guides the crew and checks work as it goes in, not just at the end.
Verify and test
Installations are verified against the drawings. Fiber is cleaned, inspected, and tested, and you receive the test results.
Work the punch list to zero
We own the punch list and close every item before we call the job done.
Close out with documentation
Labels are checked, redlines are captured, and as-built documentation is delivered at closeout.
What you can hold us to
The same on every job, whatever the size of the scope.
- QA/QC owned on every job: punch lists, installation verification, and closeout
- Accurate labeling, redlines, and as-built documentation
- Work performed to engineered drawings and MOPs
- Experienced lead techs on site who guide and check crew work